The SAT MANAGER plus point:
This unusual project of exceptional scale was proof of our capacity to adapt to the very specific needs of our client. Once the plans and proposals had been validated, there was only a short time to complete the build considering the scale of the work. Taking charge of the whole operation as a complete package allowed us to be reactive. Thanks to our twin expertise, in industry and in viticulture, we were able to optimize the build conditions.